Aluminum Degassing Methods & Measurements
To produce quality aluminum castings, metalcasters must remove excessive hydrogen in the molten metal, while conducting tests to be sure they did.
A MODERN CASTING Staff Report
(Click here to see the story as it appears in the August issue of Modern Casting.)
Molten aluminum is extremely reactive, so when it comes in contact with moist air or wet tools, the water decomposes to release hydrogen in the melt. Excessive quantities of this dissolved gas have a well-documented detrimental effect on the mechanical properties of the final aluminum castings. What is also well known to anyone making castings is that dissolved gas has an overriding effect on the distribution and amount of porosity and shrinkage. Dissolved hydrogen levels must be controlled to minimize scrap. To control gas in aluminum, metalcasters must accomplish two things:
1. Prevent and minimize introduction of hydrogen in the melt.
2. Measure and remove the hydrogen prior to pouring.
This article will focus on measurement and removal.
Gas Removal
The ability to degas molten aluminum is generally accomplished by using a purge gas, typically introduced into the melt by a rotary degassing unit. This degassing process is limited by thermodynamic laws; when purge gas bubbles are introduced to the melt, they collect hydrogen as they float toward the surface. The best possible situation is these hydrogen-saturated bubbles leave the melt and reduce hydrogen levels. In this case, the process efficiency is 100% from the thermodynamic point of view. But as the gas content in the melt drops, so does the equilibrium pressure of hydrogen in the bubbles, so the amount of purge gas required to remove the remaining hydrogen must increase.
The equilibrium gas removal ratio is shown in Fig. 1 for pure aluminum above 1,400F (760C). A gas removal ratio of 200, for example, means it will take 200 liters of inert gas to remove one liter of hydrogen. This behavior limits a metalcaster’s ability to degas to a very low level of hydrogen. The solubility also increases exponentially with temperature, meaning an increase of 200F (111C) doubles the solubility. All things being equal, a higher temperature of an aluminum melt will increase the necessary degassing time.
Alloying elements also can have an effect on hydrogen solubility. The effect of alloying elements is characterized by changes in the alloy correction factor, with some common casting alloys show in Table 1. Alloys having greater values are more difficult to degas, so, for example, aluminum 535 will take four times longer to degas than pure aluminum. Fortunately, these factors can be controlled and the gas content and process required to eliminate excessive porosity in aluminum castings can be achieved without undue difficulty in most cases.
Practical Degassing Procedures
Degassing is usually accomplished in one of three areas of the metalcasting facility:
1. In the transfer ladle, used to convey metal between melting and holding furnaces.
2. In crucible furnaces, usually just before the molten aluminum is cast.
3. In an in-line system, when the metal is conveyed to holding furnaces through a launder.
The first two options are most common and the degassing operation for both is typically accomplished using a rotary impeller degasser (RID). In practical terms, all rotary degassers are not created equal. It is important to have an optimum head design to produce highly efficient, small bubbles. Significant cost savings may be realized from shorter treatment times and reduced gas usage. In the past, the metalcasting industry has gravitated toward simple head designs, which are less costly to machine but produce larger bubbles. This path presents a false economy due to reduced efficiency.
Adjusting Process Parameters
Once the RID unit is fully lowered into the liquid metal with the shaft in place, the degassing operation can begin. The best shaft location is slightly off the centerline of the crucible or ladle to help avoid vortex formation with its circular rotation in the liquid metal. An offset distance of 2-4 in. from the centerline is usually sufficient. The use of a baffle plate also is a good idea, because the baffle opposes the circulation movement of metal and reduces vortex formation.
With the RID in the proper location, the unit should be turned on and the shaft speed should be set to 300 RPM. The inert gas flow also should be on and operators should then adjust the gas flow rate and shaft speed. Gas flow should be increased until see gas bubbles are visible as they float to the surface of the liquid metal. As the gas flow increases, the size of the bubbles should increase.
The desired result is a good dispersion of small bubbles while maintaining a relatively quiet surface. When an optimal combination of flow rate and shaft rotation speed is found, note the parameters for future use. Also note the total degassing time, which normally falls somewhere between four and eight minutes, unless the temperatures are very high or the amount of gas needed is low.
Gas Measurement
There are two primary methods of gas analysis, sampling techniques and in situ methods. Sampling techniques may be further divided into two classes. In the first, a liquid sample is withdrawn and introduced directly into the measuring instrument before solidification takes place. In the second, a sample of liquid is poured into a specially designed mold and the solid sample is analyzed. The methods of analysis are shown in Table 2.
All three methods of analyzing a liquid sample somewhat depend on the inclusion content of the melt, because these inclusions nucleate gas bubbles. Fig. 2 shows a pore in an A356 casting that has nucleated on oxide films. In spite of this problem, the Reduced Pressure Test (RPT), a procedure of examining a solid sample, is a commonly used and effective tool. The procedure is easily understood and followed. The equipment is simple, rugged and inexpensive and the results usually correlate to casting quality. However, pressure must be controlled during solidification.
Either the solidified RPT test sample is cut and polished to yield a qualitative or semi-quantitative measure of gas content or the sample density is determined by measuring the sample weight when it’s dry and then suspended in water. As long as there is no shrinkage in the sample, measuring the density is the preferred method as it eliminates the subjectivity associated with visual examination of the cut surface.
With in situ techniques, the sampling process causes no errors, so these measurements have the potential to be the most accurate and reliable. The majority of in situ methods feature a system that involves recirculating inert gas introduced into the melt by a sample probe. The inert gas is recirculated through the melt, collected and passed over a differential thermal conductivity sensor to determine the hydrogen content of the gas. This recirculation continues until the hydrogen content reaches a value in equilibrium with the melt.
The new method for measuring hydrogen is promising. The latest version of the electrochemical sensor is nearly equivalent to a thermocouple. This would be the holy grail of gas measurement, allowing us to measure gas like we measure temperature with handheld devices.
Practical Considerations on RPT
At least 90% of aluminum metalcasters in North America use the RPT to determine metal quality. A few practical approaches can improve performance.
The necessary equipment for a vacuum evaluation of an aluminum melt consists of a pump, a gauge to monitor the vacuum level inside the test chamber and a control system to regulate the pressure (Fig. 3). In practice, the molten sample is placed on the pedestal, a chamber with a viewing port is placed over the sample, the chamber is evacuated to the desired pressure, and the sample is allowed to solidify under the reduced pressure. The reduce pressure in the chamber causes dissolved hydrogen to come out of the solution in the melt and either escape from the sample through the molten surface or form bubbles inside the solidifying sample.
It is important that the operator can view the sample during solidification to see if bubbles form on the surface. In practice, the reduced pressure test is conducted two ways:
1. Low Gas Contents: Sometimes low gas metal may be required, such as needed for high-end aerospace castings or safety critical components. In these cases, the best procedure is to use a low test pressure (high vacuum) and to count bubbles forming on the surface. When less than two or three bubbles appear on the surface of the casting, gas content is low.
2. Medium to High Gas Contents: Sometimes higher gas levels are beneficial, such as in permanent mold castings, where higher gas level can help avoid shrinkage. In this case, a higher test pressure (lower vacuum) is used so that the gas remains inside the solidifying sample. The test result is usually measured by determining the density or specific gravity of the RPT sample.
In either case, it’s a good idea to train operators to look at the surface of the samples, both during the test and afterward. Two RPT samples are shown in Fig. 3. The sample on the right is of better metal quality, having fewer oxides and presumably lower gas content.
It’s important to choose the correct test pressure for the RPT test. To do this, one needs to know a little more about how pressures are measured and how pressure determines when porosity is found during solidification. Most of the gauges used on RPT testers are differential, measuring the difference in pressure between the vacuum test chamber and ambient air. At sea level, the average atmospheric pressure will support a column of mercury 29.92 in. (760mm), or 30 in. for simplicity’s sake. Most metalcasters will use a gauge pressure of 26-28 in., which is called vacuum level or pressure.
A356 alloy can be chosen as an example to show what happens during solidification. The metal contains a hydrogen gas content of 0.12cc/100g, a fairly low gas content. When a sample of this metal is taken from the crucible and placed in a RPT, the pressure of hydrogen increases because of two factors:
1. The sample cools to a lower temperature.
2. As freezing progresses, hydrogen and silicon segregate and accumulate in the remaining liquid.
The gas pressure continues to grow during solidification until it reaches the equal of the average atmospheric pressure when 70% of the sample had solidified.
For a casting of this metal freezing on your shop floor, porosity cannot form until 70% of the material is frozen solid. However, when a vacuum is applied, the situation is different. First consider the case where a gauge pressure of 28 in. is applied to the solidifying sample. The gauge pressure of 28 in. corresponds to an absolute pressure of 50 Torr. This is slightly below the equilibrium gas pressure in this sample at the start of solidification, so gas bubbles may form on the surface of this sample before it starts to freeze.
Receiving accurate readings from reduced pressure tests is essential to creating quality castings. Here are a few of the many ways of ensuring proper RPT procedures:
- Use a thin-walled cup for sample collection.
- Skim oxides from the melt
- surface.
- Preheat the cup in an adjacent surface area.
- Transport sample rapidly to a vacuum unit with proper seals and pump capacity.
- Cover the chamber that allows visual observation.
- Control vacuum to target level.
- Adjust cycle time to allow for full solidification of the sample.
- Measure specific gravity of the sample and compare to process specifications (or count bubbles on the surface).
This article was excerpted from the 2014 book, “Best Practices in Aluminum Metalcasting,” by Geoffrey K. Sigworth, published by AFS and available for purchase at www.afsinc.org/store.cfm.
ncountering a scenario in which you are forced to suddenly and immediately suspend melting operations for an extended period can be a death sentence for many metalcasting facilities. Small to mid-size businesses are the backbone of the industry, but many do not survive when forced into extended downtime. One disaster-stricken metalcaster, however, found resilience through its own perseverance and a circle of support from peers, friends, suppliers, teams from installation and repair providers, an original equipment manufacturer and even competitors.
Tonkawa Foundry, a third-generation, family-owned operation in Tonkawa, Okla., was entering its 65th year of operation this year when a significant technical failure ravaged the power supply and melting furnaces on January 17. Thanks to the textbook evacuation directed by Operations Manager Carrie Haley, no one was physically harmed during the incident, but the extent of emotional and financial damage, and just how long the event would take Tonkawa offline, was unclear.
Tonkawa’s power supply and two steel-shell furnaces would have to be rebuilt. No part of the reconstruction process could begin until the insurance company approved removal of the equipment from the site. The potential loss of Tonkawa’s employees and customers to competing metalcasters seemed inevitable.
Within two days of the incident, repair, installation and equipment representatives were on site at Tonkawa to survey the damage. Once the insurance company issued approval to begin work, the installation team mobilized within 24 hours to remove the equipment and disassemble the melt deck.
Since the damaged equipment was installed in the 1980s and 1990s, Tonkawa and an equipment services and repair company quickly strategized a plan and identified ways to enhance the safety, efficiency and overall productivity of Tonkawa’s melt deck.
“The most critical issue was for our team to organize a response plan,” said Steve Otto, executive vice president for EMSCO’s New Jersey Installation Division. “We needed to arrive at Tonkawa ready to work as soon as possible and deliver quickly and thoroughly so they could get back to the business of melting and producing castings, and minimize their risk of closing.”
Several years after Tonkawa’s melt deck was originally installed, an elevation change was required to accommodate the use of a larger capacity ladle under the spout of the furnaces. Rather than raising the entire melt deck, only the area supporting the furnaces was elevated. As a result, the power supply and workstation were two steps down from the furnaces, creating a number of inconveniences and challenges that impacted overall work flow in the melt area. Additionally, the proximity of the power supply to the furnaces not only contributed to the limited workspace, but also increased the odds of the power supply facing damage.
The damage to the melt deck required it to be reconstructed. It was determined to be the ideal opportunity to raise the entire deck to the same elevation and arrange the power supply, workstation and furnaces onto one level. The furnace installation company provided the layout concepts, and with the aid of Rajesh Krishnamurthy, applications engineer, Oklahoma State Univ., Tonkawa used the concepts to generate blueprints for the new deck construction. The results yielded a modernized melt system with an even elevation, strategically placed power supply, enhanced worker safety and increased operator productivity.
“Eliminating the steps and relocating the power supply farther from the furnaces was a significant improvement to our melt deck,” Tonkawa Co-Owner Jim Salisbury said.
Within four days of insurance company approval, all damaged equipment had been removed and shipped for repair.
The insurance company required an autopsy on the damaged furnace before any repair work could begin. The forensic analysis was hosted by EMSCO in Anniston, Ala., in the presence of insurance company personnel, as well as an assembly of industry representatives from the companies who had received notices of potential subrogation from the insurance company.
Tonkawa’s furnace was completely disassembled while the insurance company’s forensic inspector directed, photographed, cataloged and analyzed every turn of every bolt on the furnace over a nine-hour workday. The coil was dissected, and lining samples were retained for future reference.
While the furnace sustained extensive damage, it did not have to be replaced entirely.
Structural reconstruction was performed to address run-out damage in the bottom of the furnace, a new coil was fabricated and the hydraulic cylinders were repacked and resealed. Fortunately, the major components were salvageable, and ultimately, the furnace was rebuilt for half the cost of a new furnace.
“The furnace experienced a significant technical failure,” said Jimmy Horton, vice president and general manager of southern operations, EMSCO. “However, not only was the unit rebuilt, it was rebuilt using minimal replacement parts.”
Though work was underway on the furnaces, Tonkawa was challenged with a projected lead time of 14 weeks on the power supply.
When accounting for the three weeks lost to insurance company holds and the time required for installation, Tonkawa was looking at a total production loss of 18-20 weeks. From the perspective of sibling co-owners Sandy Salisbury Linton and Jim Salisbury, Tonkawa could not survive such a long period of lost productivity. After putting their heads together with their furnace supplier, it was determined the reason for the long turnaround on the power supply could be traced to the manufacturer of the steel cabinet that housed the power supply.
The solution? The existing cabinet would be completely refurbished and Tonkawa would do the work rather than the initial manufacturer. This reduced the 14-week lead time to just five weeks.
Tonkawa is the single source for a number of its customers. Although lead-time had been significantly reduced, the Tonkawa team still needed a strategy to keep the single source customers in business as well as a plan to retain their larger customers.
Tonkawa pours many wear-resistant, high-chrome alloys for the agriculture and shot blast industries. Kansas Castings, Belle Plaine, Kan., which is a friendly competitor, is located 50 miles north of Tonkawa. Kansas Castings offered Tonkawa two to three heats every Friday for as long as it needed.
“We made molds, put them on a flatbed trailer, prayed it wasn’t going to rain in Oklahoma, and drove the molds to Kansas Castings. We were molding, shot blasting, cleaning, grinding and shipping every Friday,” Salisbury Linton said.
Others joined the circle of support that was quickly surrounding the Tonkawa Foundry family.
Modern Investment Casting Corporation (MICC) is located 12 miles east of Tonkawa in Ponca City, Okla. Though MICC is an investment shop and Tonkawa is a sand casting facility, MICC’s relationship with Tonkawa dates back years to when Sandy and Jim’s father, Gene Salisbury, was at the helm.
“Gene was always willing to help you out,” said MICC owner, Dave Cashon. “His advice was invaluable for us over the years, so when the opportunity arose to support Sandy and Jim, we volunteered our help.”
MICC offered to pour anything Tonkawa needed every Friday in its furnace. Tonkawa brought its alloy, furnace hand and molds, while MICC provided its furnace and a furnace hand for three heats. Many of the specialty parts Tonkawa produces were completed with MICC’s support.
When Salisbury Linton approached Cashon and asked him to issue her an invoice to cover the overhead Tonkawa was consuming, Cashon told her if she brought in six-dozen donuts every Friday morning they’d call it even.
“We’re all kind of like family,” Cashon said. “We’re all part of the same industry and though we may be friendly competitors at times, you don’t want to see anybody go through what they’ve gone through and it could have just as easily been our furnace that failed. While we all take the appropriate measures and perform maintenance to prevent these scenarios from occurring, they unfortunately still occur from time to time in our industry.”
Tonkawa had recently added steel work to its menu of services and Central Machine & Tool, Enid, Okla., was able to take Tonkawa’s patterns and fulfill its steel orders so it would not fall behind with those customers, while CFM Corporation, Blackwell, Okla., took three of Tonkawa’s employees on a temporary basis and kept them working during the downtime. Additionally, a couple of Tonkawa’s major suppliers extended their payables terms.
Thanks to Tonkawa’s suppliers, friends and its personnel’s own passion, persistence and dedication, the business is up, running and recovering—placing it among the few shops of its size to overcome the odds and remain in business after facing calamity.
Nearly eight months after that devastating Saturday evening in January, Salisbury Linton reflected on the people and events that helped Tonkawa rise from the ashes. “We certainly would not have the opportunity to see what the future holds for Tonkawa if it weren’t for all the kind-hearted people who cared about what happened to us. Everyone still checks in on us.”